March 30, 2012 - Haven't posted for a couple of days.  Not a lot of activity to show but we have met or talked with the Electrician, Plumber and the Mason.  We will be out of town for a week so we had to get ahead of the game so the guys can still work.  Donna has been REAL busy looking at vanities, fixtures and giving the workers directions on what she has planned.  When we get back I'm sure there will be a LOT to share.

The Plumber has been here!
Click on the image to see a larger picture.

This is the bathroom on the first floor.
Click on the image to see a bigger picture.

Tuesday, March 27, 2012

March 24-27, 2012 - Another weekend of nice weather and progress on the home building.  No obvious work done today (Monday) but Donna met with the mason and they talked about what she wanted done.  I called the plumber and we talked about tank-less water heaters vs regular water heaters.  Donna will meet with the electrician this week and layout the sockets and other special electrical stuff.

Shingles are all on and the roof vents are installed.
Click on the picture to see a larger image.

The mason has already placed some of his scaffolding and is ready for the brick to arrive.
Click on the picture to see a large image.
 

Thursday, March 22, 2012

March 22, 2012 - Another March day with the weather in the low 80's.  There was a forecast of scattered T-Storms but nothing showed up as of this posting at 7:15PM.  A lot accomplished today as you can see from the pictures I posted.

Windows and doors in and the second floor is roofed.
Front view of the house.
Click on the picture to see a larger image.
Windows in and the guys were just finishing the roofing of the second floor
roof when I stopped by after work.  Rear of the house.
Click on the image to see a larger picture.


Wednesday, March 21, 2012

March 21, 2012 - High of 82 today and clear skies.  May have some rain on Friday but as of now the weather is perfect for building.  The vast majority of the windows are in and I talked to the on-site builder today about some minor stuff that needs to be done inside.

Front view with the windows installed.
Click on the picture to see a larger image.

View of the rear of the house with most of the windows installed.
Click on the picture to see a larger image.
View from the inside of the sun room.
Click on the picture to see a larger image.

Tuesday, March 20, 2012

March 20, 2012 - Today the weather was in the 80's and SUPER nice.  I had to work late and didn't leave Lexington until after 6:30PM.  When I was about 5 miles from the house I called Donna to see if she wanted me to pick her up and go see the house.  She had just finished a lesson in Berea and was already at the house.  She waited until I got there and we checked out the progress for the day.

This was taken around 7:15PM or so.  The cement didn't arrive until sometime after
2:00PM so the finisher got a late start.  He told me he would be there late tonight.
Click on the picture for a larger image.

The front porch looks real good.
Click on the picture for a larger image.

The Chief Inspector (not from "The Pink Panther") checks out the work.
Click on the picture for a larger image.

Monday, March 19, 2012

March 19, 2012 - We are two thirds of the way through March and I can't believe the weather was in the low 80's with partly cloudy skies.  Couldn't ask for better weather! Today I finished work early and went out to the house at 4:00PM.
 
Shingles are here!
Click on the picture to see a larger image.

The front porch is ready to have the cement poured.  Scheduled for tomorrow.
Click on the picture to see a larger image.

The garage floor is also ready for the cement.
Click on the picture to see a large image.

Saturday, March 17, 2012

March 17, 2012 - Donna and I were out and about and of course had to stop by the house.  Nice day for working and they guys have been busy. In the low 70's today with cloudy, but sunny skies. I talked to one of them today and asked if they always work Saturdays?  He said if they lost a day during the week because of weather or lack of materials they will work on Saturday.  I also asked him if they were real busy and he said right now they weren't but are hoping the spring/summer season will bring work.

House is wrapped and the front porch is up!  We were told the porch and garage
will be poured early next week and the shingles will arrive as well.
Click on the picture to see a larger image.

The BIG BOSS of this project inspects the construction!  It appears that all has passed with no problems.
Click on the picture to see a large image.  

All the braces that used to be up are now gone.  To the left is the sun room and
Donna is facing the kitchen area.
Click on the picture to see a larger image.

Thursday, March 15, 2012

March 15, 2012 - Another beautiful day considering it's the middle of March and normally we have a lot of rain and much cooler weather.  In the low 70's and during the day not a cloud in the sky...at least until the guys got off work.  The entire house is finally covered and they started putting the tar paper on about 1/2 of it.  Compare these pictures with yesterday's and you will see what I mean.

View from the front of the house.  Notice the clouds in the sky?
The picture was taken around 5PM.
Click on the picture to see a larger image.

Rear view just a few minutes after I took the picture from the front.  Notice the  clouds!
Don't you love Kentucky weather?
Click on the picture to see a larger image.






Wednesday, March 14, 2012



March 14, 2012 - Another day of outstanding weather.  High of 77 and sunny all day long.  Work is still progressing.  The guys have put up all the sheeting on the outside and most of it on the roofs.  Looking good.

Front of the house.
Click on the picture to see a larger size.
Rear of the house.
Click on the picture to see a larger size.



Made a video tour of the first floor today.


Tuesday, March 13, 2012

March 13, 2012 - Over the weekend it rained a little bit but today was so nice.  High of 71 degrees and mostly sunny.  I couldn't wait to get off work and check out the house. I'm glad I stopped by to see the progress.  The basic frame of the roof is up and as you can see from the top picture on the right side of it there is plywood for the roof.  


Panorama of the front of the house.
Click on the picture to see the original size.
View of the rear of the house.
The part sticking out is the Master Bedroom.
Click on the picture to see the original size.

Friday, March 9, 2012

March 9, 2012 - Another day of exceptionally nice weather and the guys were busy at work.  As you can see below the rafters are built over the main part of the house.

Taken from the hill across the street.
Click on the picture to see the original size.

Wednesday, March 7, 2012

March 7, 2012 - Didn't get home yesterday until after 8PM and it was too dark to get pics.  Today was perfect with the temps in the high 60's and when I got onsite all I could say was WOW!  Lots of progress and Donna happened to be there at the same time and we spent about 1/2 hour just walking around.

View of the rear of the house.  Second floor is coming along nicely.
Click on the picture to see the original size.


Another view of the backside of the house.

This picture was taken from the hill across the street.
Click on the picture to see the original size.






Monday, March 5, 2012

March 5, 2012 - This morning it snowed about 2" in our part of Madison County and when I left for work this morning it looked like this...
Taken around 6:45AM

However by the time I returned from work around 4:00PM the high temp for the day was 38 degrees and the snow was gone and the guys were working.  All the joists for the second floor are in place and most of the deck is done.

The deck to the second floor is almost done and that is a wall ready to go up.
Notice the nice blue sky after a snowy start this morning.
Click on the picture to see the original size.

Here is a view from the front.
  



Saturday, March 3, 2012

March 3, 2012 - It's Saturday and the guys are out working because yesterday they couldn't  - Tornado Warnings all over Madison County.  The frame for the garage is up and ready and they are working on the joists for the second floor now.  Great weather.  Sunny day in the high 40's.

View of the garage.
Click on the image to view full size.

Here Donna is clarifying something on the prints with the builder.
Click on the image to view full size.

Thursday, March 1, 2012

March 1, 2012 - More progress as the garage walls are now up, some of the plywood is on the outer walls and some of the second floor joists are in place.  It was an outstanding day for working with full sun and mild temps all day.