Wednesday, October 17, 2012

October 17, 2012 - Donna and I have been doing a lot of work at the house and I have been working 4PM to Midnight lately.  Not able to keep the blog up to date.

We have been painting, calling sub-contractors, buying household items (lights, door knobs, etc) and staying real busy.  Had an inspection yesterday and there were a few items we need to correct.  HVAC inspection is complete and the electrical should be done sometime this week.  The Health Department has to come out and certify the septic system and our plumber has been trying to get a firm date/time for that to happen.


We anticipate moving in before the end of October!  We still have some rooms to paint but most were done when Meredith was up to help for two weeks.

Kitchen lights are installed and working.  Sink as well.
Click on the picture to see a larger image.

This is the light fixture in the piano room.
Click on the picture to see a larger image.

Plumber putting in the sump pump.
Click on the picture to see a larger image.

View of the house WITH the mailbox in place.  There was a LOT of
rock I had to dig through to get the box deep enough.
Click on the picture to see a larger image.