Monday, October 22, 2012

October 17-21, 2012 - Donna and I have been at the house as much as possible getting stuff finished.  We finally decided on what we wanted to do with the upstairs floors.  We are going to have pre-finished wood installed in the game room and down the hallway, while the bedrooms will have carpet.  That should be done this week.

I finished with those items required for the final inspection and we hired our painter, Herb to finish all the caulking of the windows.  Now with the exception of the Elevation Certificate and inspection of the Septic we are ready for the final inspection.

Our painter, Herb finishing on the caulking.  He is an excellent painter and we highly recommend him.
Click on the picture to see a larger image.

The stove is finally in!  The granite guy had to come out and trim
the edge so it would fit.  He also installed the back splash too.
Click on the picture to see a larger image.

He did such a good job on the back splash and you can't even see the seam.
I looked very close and couldn't see it.
Click on the picture to see a larger image.

No comments:

Post a Comment