Wednesday, June 13, 2012

June 13, 2012 - Progress both inside and outside the house.  Stopped by today after work and the tile guys were still working.  The sun-room, upstairs and downstairs bathrooms, downstairs laundry room and part of the master bath are done.  Also today they dug the trench for the electrical and put in part of the septic system.  I have never seen this type of septic field so I guess I'm going to have to go online and see how it works.  If someone out there has seen this before please free to post here an explanation or a link.

Laundry room on the first floor.
Click on the picture to see a larger image.

Trim in the master bath shower.
Click on the picture to see a larger image.

Trench is dug for electrical.
Click on the picture to see a larger image.

Septic field.  There is a third trench to the right.
Click on the picture to see a larger image.

1 comment:

  1. Looks like a pressure distribution drainfield...

    http://www.kingcounty.gov/healthservices/health/ehs/wastewater/owners/types.aspx

    ReplyDelete