Monday, June 25, 2012

June 25, 2012 - The HVAC is on and the house is a cool 73 which allowed the installation of the wood floors.  After work I checked on the progress and was amazed at how much was already done!  Talked to the installer and he said they would finish tomorrow and start sanding right away.  Check back SOON to see the progress.

Wood floors being installed in the kitchen.
Click on the picture to see a larger image.

Dining room is done.  Although not pictured, the piano room, hallway,
downstairs bathroom and most of the living room is done.
Click on the picture to see a larger image.

Getting ready in the Master Bedroom.
Click on the picture to see a larger image.