Friday, June 22, 2012

June 21, 2012 - Milestone at the house today.  We have electricity now!  The temporary service was disconnected and the house is officially hooked up to the grid.  Also the plumber back filled both the water line and the electrical service line.  Later that afternoon BG Energy came in and installed a new transformer that will service our home and Dave and Laura's home whose property is right next to us.  Hopefully on Friday the HVAC guys will come in and hook up the Geo-Thermal system.  We have to have the AC on so the hardwood floors can acclimate to the house prior to installation.

The blown-in insulation was completed two days ago and now it looks like it snowed in the ceiling!

Been very warm lately, almost like it's already mid-July.  Mid to high 90's and no rain for a long time.  I heard on the weather report yesterday that our rainfall is 5"  below normal.

Blown-in insulation above the master bedroom.
Click on the picture to see a larger image.
The plumber finished back-filling the water line out front and here he is
doing the electrical line from the house to the pole.
Click on the picture to see a larger image.


BG Energy installing a new, larger transformer that will service our home and the neighbor.
Click on the picture to see a larger image.